SHEET F-00 — DRAWING INDEX
From the first drawing to the last payment.
Construction estimate and BOQ software for Indian contractors, civil engineers and builders. Twelve tools, filed the way a drawing set is: estimating, commercial and site.
F-01
Estimating
Upload a plan, or start from area and floors. Quantities come off element by element and are priced at your city's rates.
- C-01
- BOQ generator
- A full, numbered bill of quantities from a drawing or from area alone.
- C-02
- Plan upload
- Read PDF and DXF drawings and take quantities off the elements.
- C-03
- Material breakup
- Cement, steel, sand, aggregate and bricks for every stage of work.
- C-04
- Purchase list with wastage
- Order quantities with wastage margins for Indian site conditions.
- C-05
- Local rates
- City-wise material and labour rates you can edit per project.
- 01Booking & Mobilization10%₹36,57,614
- 02Excavation & Foundation casting15%₹54,86,421
- 03Plinth Beam & Ground Slab15%₹54,86,421
- 04RCC Roof Slabs & Columns20%₹73,15,227
- 05Masonry Wall & Plastering15%₹54,86,421
- 06Concealed Services & Wiring10%₹36,57,614
- 07Flooring, Tiles & Windows10%₹36,57,614
- 08Final Painting & Handover5%₹18,28,807
F-02
Commercial
Turn the estimate into a quote you can defend: your margin, GST, a payment plan tied to milestones, and a report with your name on it.
- C-06
- Margin & GST
- Your profit margin and overheads, with GST calculated on top.
- C-07
- Payment schedule
- Stage-wise payments tied to construction milestones.
- C-08
- PDF reports
- Client-ready reports with your name on them.
- C-09
- Accuracy check
- Flags thin inputs and risky assumptions before you send a quote.
F-03
Site & communication
Ask the project questions, plan the labour, and send the client a summary they'll actually open.
- C-10
- Labour summary
- Skilled and unskilled labour-days, and the cost behind them.
- C-11
- AI copilot
- Ask questions about a project’s costs and get answers from its own numbers.
- C-12
- WhatsApp summary
- Send a formatted project summary to a client in one tap.
How much steel does the frame need?
70.8 t across all grades: 42.5 t Fe500, 21.3 t Fe500D and 7.1 t Fe550. That's ₹37,53,980 at your current rates.
And labour?
2,066 skilled and 4,132 unskilled labour-days: ₹49,58,400 in total.
*Sample residential tower*
Stilt + 6 · 15,400 sq ft · Standard
Estimate: ₹3,65,76,137 (incl. GST)
Per sq ft: ₹2,375
Range: ₹3.44 – 4.02 Cr
Steel 70.8 t · Cement 3,347 bags
Bricks 4,95,880
Full BOQ attached as PDF.
Try all twelve on your own project.
Three projects free on the Free plan, or 14 days of Pro.